Tabteen-CPT awarded two major contracts for SWA and WTTCO

Tabteen & Corrosion Prevention Technologies Company (Tabteen-CPT) is pleased to announce the recent signing of two new cement mortar lining (CML) projects for WTTCO and SWA.

Project details:

  1. North Riyadh Strategic Reservoir Project (Shaqra, Ghanman, Majmaah & Alghat)‏
  2. Qatif Pipeline Relocation Project

These two projects play a significant role in the expansion of infrastructure for water production, treatment, transmission, and storage, to meet the increasing demand in Saudi Arabia.

Collectively, the CML scope exceeds 46 kilometres — with pipe sizes ranging from 28-inch to 64-inch in diameter. Work is set to begin January 2025 at our new workshop on the Dammam-Riyadh road (Highway 40).

Ready to work with us?

Submit your queries